On 3 June, the corner stone was placed for the new high-tech E-Piim dairy plant located at Ruubassaare tee 12 in Paide, Estonia. The new plant with the total area f 32000 m2 will be completed in 2023.
The design was prepared by Novarc Group. Architects are Lauri Laisaar and Inge Sirkel-Suviste. Project manager is Vallo Goroško. The construction main contractor is Nordecon.
For more see Järva Teataja and Nordecon’s press release and listen to news on Estonian Public Broadcasting.